A big thanks to all the members who came out and helped with the floor prep at the Squad building Monday night. We are removing the old tile that was failing and replacing it with epoxy flooring.


0 Comments

Leave a Reply

Avatar placeholder

Your email address will not be published. Required fields are marked *